Cilacap coal-fired power plant in Central Java [2 x 300 MW ] sufferingfrom coal supply due to high sea level that interrupting coal shipment from Kalimantan during the past several days.
With coal consumption in average 2,500 MT/day for each turbine. Due to the limited coal stocks, the plant being forced to operate only one of [...]
Filed under: Gossip By Country, Indonesia | Tagged: Cilacap Power Plant, Indonesia, Java-Bali grid system, Kalimantan Coal, Kalimantan Coal Supplier, LAck of Supply, Paiton, Paiton power plant, Power Plant, Suralaya | Leave a Comment »




